Services · Florida Keys

Permitting Support
in the Florida Keys

Engineer-led permit coordination through every Monroe County building department including, Army Corps, FDEP and SFWMD to service all the client's needs for permitting their project in an efficient and timely manner.

6,500+Keys projects
11+Years Keys experience
PE #79269Florida license
4.9 ★Client rating

Overview

Permit reviews in the Florida Keys often cross multiple agencies and return structural, flood, or marine comments that require a sealed engineering response. We handle revisions, RFI packages, variances, and post-denial rescue across every Keys jurisdiction.

What We Deliver

Permitting Support Capabilities

Monroe County permit coordination

Full permit support with all building departments located in Monroe County. Including the city of Key West, Marathon, Key Colony Beach, Layton and Village of Islamorada. We can submit the full permit package with construction documents for your project on behalf of the owner or the client's builder/contractor

ACOE permit support

US Army Corps of Engineers permit support: Nationwide Permits, Section 404 submissions, General Permits, and individual permits for marine projects across the Keys.

FDEP permit support

Environmental Resource Permits including submerged lands coordination for projects that include over water or wetland areas that are impacted.

SFWMD permit support

South Florida Water Management District coordination for projects affecting regional drainage, stormwater, and water resource systems.

FKNMS permit support

Florida Keys National Marine Sanctuary coordination for marine projects in Sanctuary Preservation Areas including, seagrass and coral impacts for your marine project.

Permit revisions and RFI responses

Engineer-led responses to building department for ACOE, FDEP, SFWMD and FKNMS projects accurately addressing and resolving the agency comments during the first review cycle.

Variance and code modification support

Engineering support for code variance applications, hardship requests, and alternative design method submittals coordinated with the jurisdiction land development code and planning department to achieve the client's project intent.

Our Process

How the work moves

  1. 01

    Consultation

    We review the permit status — new submittal, RFI, denial, revision — and identify which agency or reviewer is driving the issue and what engineering response will resolve it.

  2. 02

    Site Visit & Proposal

    After completion of the site visit (when field confirmation is required), a detailed estimate will be sent to the client outlining the scope of work to be provided by Campbell Engineering, along with a project delivery schedule. Upon acceptance of the proposal and receipt of a mutually agreed retainer payment, the project will be scheduled to commence the permitting support and engineering response.

Answers

Frequently asked questions

How long does it take to get a building permit in Monroe County?
A building permit for a smaller renovation or restoration project in Monroe County typically takes about 30 days. For a major renovation, home addition, or new home, it usually takes 30 to 60 days to acquire. Timelines start once a complete, sealed package is in the system — incomplete submittals or plan-review comments add time beyond those windows.
What documentation do I need to submit for a building permit in the Florida Keys?
You'll need plans certified by a design professional and Florida Product Approval documentation for items like doors, windows, and roofing materials. Depending on the scope of work, you may also need a boundary survey, and a vegetation survey if you're developing a vacant lot. Finally, you'll need the signed and notarized documentation required by the local building department. Marine or waterfront work often adds agency packages on top of the local building submittal.
Do I need an engineer to submit for a permit in the Florida Keys?
No. A homeowner, permit expediter, or licensed contractor can file for the permit. Keep in mind this refers to submitting the application itself — if your project involves modification of the structure and additions to the existing site or structure, plans will be required by a licensed engineer/architect.
Can you help if my permit application was rejected in Monroe County?
Yes. Permit applications are typically rejected because of plan-review comments — deficiencies flagged by the building department's reviewers (structural, floodplain, environmental, mechanical, and others). We can review the rejection comments, identify what needs to be corrected, revise and re-certify the affected plans, and resubmit the application to resolve the issues and move your permit forward.

Start your permitting support project

Ready to put a licensed engineer on your Keys project?

Sealed under our Florida PE license (PE #79269). Site visits scheduled inside a week across the Keys.